Austin
All things to do

AnytimePlaygrounds

Joanne Land Playground at Old Settlers Park

City of Round Rock

Round Rock's rebuilt Joanne Land Playground at Old Settlers Park reopened Saturday, Apr 25, 2026, near the Lakeview Pavilion and Stage. According to the City's Apr 27, 2026 news release, the replacement is about twice the size of the original and the largest playground in the city's inventory. It has integrated lighting, poured-in-place rubber surfacing, and plastic components designed to minimize heat absorption. It was designed and installed by WeBuildFun, Inc., which also installed the original 2016 playground, and the City says this was the first installation of this particular equipment. The project was funded through $1.87 million in voter-approved 2023 general obligation bonds; the release also says Council allocated funds in 2025 for the replacement project. The playground is named for longtime City Secretary Joanne Land (1970–2002). It is free; hours, parking, shade and restrooms are not posted in the release. Nearby are new tennis and pickleball courts at the Adult Recreation Complex, 3443 Aten Loop, and the Lakeview Stage. In December, the same park hosts Light Up the Lake.

A large group of children lined up in front of the new playground towers and tube slides at the Joanne Land Playground opening.

City of Round Rock

Kids at the Joanne Land Playground opening. Photo: City of Round Rock.

All agesFreeRound RockHours not posted.Outdoor
Visit website

Round Rock's rebuilt Joanne Land Playground at Old Settlers Park reopened Saturday, Apr 25, 2026, near the Lakeview Pavilion and Stage. According to the City's Apr 27, 2026 news release, the replacement is about twice the size of the original and the largest playground in the city's inventory. It has integrated lighting, poured-in-place rubber surfacing, and plastic components designed to minimize heat absorption. It was designed and installed by WeBuildFun, Inc., which also installed the original 2016 playground, and the City says this was the first installation of this particular equipment. The project was funded through $1.87 million in voter-approved 2023 general obligation bonds; the release also says Council allocated funds in 2025 for the replacement project. The playground is named for longtime City Secretary Joanne Land (1970–2002). It is free; hours, parking, shade and restrooms are not posted in the release. Nearby are new tennis and pickleball courts at the Adult Recreation Complex, 3443 Aten Loop, and the Lakeview Stage. In December, the same park hosts Light Up the Lake.

At the venue

Good to know

  • Accessibility

    The City says the playground "includes modern safety and accessibility features," with no further detail.

Details come from the organizer's public website. Times and prices change — please verify before visiting. Last checked Nov 22, 2026. Source

Is this your business? Claim this listing

0 parent views

Watch

Videos

Videos from local creators and organizations, shared for reference. Zippy Guide isn't affiliated with them.